Building Construction, Renovation/Replacement
As the Worthington School District continues to replace and renovate our school buildings, these environmental considerations are in place:
- Equipment and/or systems are replaced with Energy Star or LEED compliant equipment, high energy efficiency
- LED Lighting – interior and exterior
- Water reduction - reduced flow automatic flush valves
- Energy efficient boilers
- Energy efficient chillers
- Use of variable seed frequency drives
- Solar reflective film
-
Use of permeable pavers (Worthingway)
-
Solar reflective roofing membranes
-
Use of condensing boilers